Abstract
Uneven truck arrivals and weak coordination among gates, yards, customs authorities, and trucking companies increase waiting time and uncertainty in port-hinterland operations extracted from Data Warehouse” and contain 40 consecutive observations from February 2023 to May 2026. No formal data dictionary, organizational identifier definition, or counting-rule metadata accompanied the file; therefore, recorded fleet count is interpreted as monthly recorded activity volume rather than unique truck visits to the gate. After data-quality checks, descriptive statistics, correlation analysis, five competing regression specifications, Newey-West inference, stationarity and cointegration diagnostics, first-difference robustness analysis, and internal rolling-origin validation were conducted. A conditional model using current-month realized tonnage was explicitly separated from operational models restricted to information available before the target month. Transit tonnage and recorded fleet activity were strongly correlated (r = 0.854). The conditional tonnage-plus-trend model achieved R² = 0.950 and a conditional-estimation MAPE of 3.30%; this value is not an operational forecast-accuracy measure. The lagged-tonnage operational model achieved a MAPE of 5.15%, and its 95% prediction interval covered 15 of 16 target observations; however, its improvement over a drift benchmark was not statistically conclusive (Diebold-Mariano p = 0.115). The small sample, remaining serial dependence, and absence of event-level gate data preclude direct inference about queues or hourly slot capacity. A five-layer, three-stage auditable framework is therefore proposed, progressing from standardized event data and a limited pilot to predictive and adaptive appointment management. The contribution is a staged development pathway, not a final gate-capacity algorithm.
Keywords
Subjects