- سند چشمانداز حملونقل ریلی در افق 1404.
- سالنامه آماری وزارت راه و شهرسازی، 1397.
- محمودی, س.م. (1399)، "نقش سیستمهای تخلیه و بارگیری در تعیین ظرفیت شبکه ریلی".; Available from: https://www.tinn.ir/fa/tiny/news-228126.
- Krüger, N., I. Vierth, and F. Fakhraei Roudsari, (2013), “Spatial, temporal and size distribution of freight train delays: evidence from Sweden”. Centre for Transport Studies.
- Zhou, J. and P. Zhang. (2015), “Design and Application of Robotic Package Stacking for Train Loading in Ports”. 3rd International Conference on Mechatronics, Robotics and Automation. Atlantis Press.
- Caris, A., C. Macharis, and G.K. Janssens, (2008), “Planning problems in intermodal freight transport: accomplishments and prospects”, Transportation Planning and Technology, Vol 31(3), pp: 277-302.
- Weber, P.J. and K.W. Reichelt, (2018), “Railway facility with high throughput loop track”, Google Patents.
- Shao, Y., et al., Lectotype and Quantity, (2015), “Optimization of Handling Machines for Railway Freight Transport: The Case of Kunming Railway Bureau”, in ICTE 2015. pp: 2151-2159.
- Chen, B., H. Lv, and Z. Liu, (2013), “Selection of railway-water intermodal transportation port station handling machinery”, ICTE 2013: Safety, Speediness, Intelligence, Low-Carbon and Innovation. pp: 773-779.
- García, A. and I. García, (2012), “A simulation-based flexible platform for the design and evaluation of rail service infrastructures”, Simulation Modelling Practice and Theory, pp: 31-46.
- Xie, M., L. Wang, and W. Yang. (2019), “A Flexible Scheduling Mode of Gantry Cranes for Railway Container Terminal”, in Journal of Physics: Conference Series. IOP Publishing.
- Ballis, A. and E.K. Morlok, (2004), “Advanced rail and maritime system demonstrations in Europe”, Transportation research record, Vol1873(1), pp: 89-98.
- Lovett, A.H., C.T. Dick, and C.P.J.P.o.R.T. Barkan, (2015), “Determining freight train delay costs on railroad lines in North America”.
- Gambardella, L.M., A.E. Rizzoli, and P. Funk, (2002), “Agent-based planning and simulation of combined rail/road transport”, Simulation, Vol78(5), pp: 293-303.
- Rizzoli, A.E., N. Fornara, and L.M. Gambardella, (2002), “A simulation tool for combined rail/road transport in intermodal terminals”, Mathematics and Computers in Simulation, Vol59(1-3), pp: 57-71.
- Alicke, K., (2005), “Modeling and optimization of the intermodal terminal Mega Hub, in Container Terminals and Automated Transport Systems.”, Springer, pp: 307-323.
- Boysen, N., M. Fliedner, and M. Kellner, (2010), “Determining fixed crane areas in rail–rail transshipment yards”, Transportation Research Part E: Logistics and Transportation Review, Vol46(6), pp: 1005-1016.
- Li, X., A. Otto, and E. Pesch, (2019), “Solving the single crane scheduling problem at rail transshipment yards”, Discrete Applied Mathematics, Vol (264), pp: 134-147.
- Zhang, Q., et al., (2020), “Research on Loading and Unloading Resource Scheduling and Optimization of Rail–Road Transportation in Container Terminal Based on “Internet”, for Ghana Container Port Development Planning, Journal of Advanced Transportation, 2020.
- Chang, Y., et al., (2019), “Integrated scheduling of handling operations in railway container terminals”, Transportation Letters, Vol11(7), pp: 402-412.
- Yan, B., et al., (2020), “Integrated planning of train schedule template and container transshipment operation in seaport railway terminals”, Transportation Research Part E: Logistics and Transportation Review, Vol142, pp: 102061.