-Averbakh, I. and Xue, Z. (2007)" On-line supply chain scheduling problems with Preemption", European Journal of Operational Research, Vol.181, No.1, pp. 500–504.
-Buer, M. G. V., Woodruff, D. L and Olson, R. T. (1999) "Solving the medium newspaper production/distribution problem", European Journal of Operational Research, Vol.115, No.2, pp. 237–253.
-Chandra, P. and Fisher, M. L. (1994) "Coordination of production and distribution planning", European Journal of Operational Research., Vol.72, No.3, pp. 503–517.
-Chang, Y. C. and Lee, C. Y. (2004) "Machine scheduling with job delivery coordination, European Journal of Operational Research., Vol. 158, No. 2. pp. 470–487.
-Chen, Z. L. (2010) "Integrated production and outbound distribution scheduling: Review and extensions", Operations Research, Vol.58, No.1. Pp.130–148.
-Chen, H. K. Hsueh, C. F. and Chang, M. S. (2009) "Production scheduling and vehicle routing with time windows for perishable food products”, Computers and Operation Research, Vol.36, No.7, pp. 2311-2319.
-Chen, H. K., Hsue, C. F. and Chang, M. S. (2009) "Production scheduling and vehicle routing with time windows for perishable food products”, Computers and Operation Research, Vol.36, No.7, pp. 2311-2319.
-Chen, Z. L. and Pundoor, G.)2006(“Order assignment and scheduling in a supply chain", Operations Research, Vol. 3, pp. 555–572.
-Chen, Z. L. and Vairaktarakis, G. L. (2005) "Integrated scheduling of production and distribution operations", Management Science. Vol.51, No.4, pp.614–628.
-Chen, Z. L. (2004) “Handbook of quantitative supply chain analysis: modeling in the EBusiness era”, Kluwer Academic Publishers: Norwell, MA, USA.
-Cheng, B.Y., Joseph, Y. T. and Li, K. (2015) "Integrated scheduling of production and distribution to minimize total cost using an improved ant colony optimization method", Computers and Industrial Engineering, Vol. 83, pp. 217-225.
-Devapriya, P., Ferrell. W. and Geismar. N. (2006) "Optimal fleet size of an integrated production and distribution scheduling problem for a perishable product", Working Paper., Clemson University.
-Farahani, P., Grunow, M. and Gunther, H. O. (2012) "Integrated production and distribution planning for perishable food products", Flexible Service Manufacturing Journal, Vol. 24, No. 1, pp. 28-51.
-Geismar,H. N., Laporte,G. L. L. and Sriskandarajah, C. (2008) "The integrated production and transportation scheduling problem for a product with a short lifespan, Informs Journal on Computing, No. 20, pp. 21-33.
-HajiaghaeiKeshteli, M. and Aminnayeri, M. (2014) "Solving the integrated scheduling of production and rail transportation problem by Keshtel algorithm”, Applied Soft Computing, Vol. 25, pp. 184-203.
-Lee, C. Y. and Chen, Z. L. (2001) "Machine scheduling with transportation considerations”, Journal of Scheduling, Vol. 4, No.1, pp. 3–24.
-Liu, Z., Zhang, Y. and Li, M. (2014) "Integrated scheduling of ready-mixed concrete production and delivery", Automation in Construction, Vol. 48, pp. 31-43.
-Miller, C. E., Tucker, A. W. and Zemlin, R. A. (1960) "Integer programming formulations and traveling salesman problems", Journal of the ACM, Vol. 7, pp. 326–329.
-Madronero, M. D., Peidro, D. and Mula, J. (2015) "A review of tactical optimization models for integrated production and transport routing planning decisions", Computers and Industrial Engineering, Vol. 88, Issue C., pp. 513-535
-Peer, E. S., Van Den Bergh, F. and Engelbrecht, A. P. (2003) "Using neighborhoods.
-Pundoor, G. and Chen, Z. L. (2005) "Scheduling a production-distribution system to optimize the tradeoff between delivery tardiness and total distribution cost", Naval Research Logistics, Vol. 52, No. 6, pp. 571–589.
-SaidiMehrabad, M., DehnaviArani, S. Evazabadian, F. and Mahmoodian, V. (2015) "An ant colony algorithm (ACA) for solving the new integrated model of job shop scheduling and conflict-free routing of AGVs., Vol. 86.pp. 2-13.
-Schmid, V., Doerner, K. F. and Laporte, G. (2013) "Rich routing problems arising in supply chain management", European Journal of Operational Research., Vol. 228, pp. 435-448.
-Ullrich, C. A. (2013)"Integrated machine scheduling and vehicle routing with time windows", European Journal of Operational Research, Vol. 227, No. 1, pp. 152–165.
-Zegordi, S. H., Itoh, K. and Enkawa, T. (1995) "A knowledgeable simulated annealing scheme for the early/tardy flow shop scheduling problem", International Journal of Production Research., Vol. 33, No.5, pp.1449-1466.
-Zegordi, S. H., Abadi, I. N. K. and BeheshtiNia, M. A. (2007)" A novel genetic algorithm for solving production and transportation scheduling in a two-stage supply chain”, Computers and Industrial Engineering, Vol. 58, No. 3, pp. 373–381.
-Zhong, W. Y. Dosa, G. and Tan, Z. Y. (2007)"On the machine scheduling problem with job delivery coordination", European Journal of Operational Research., Vol. 182, No. 3, pp.1057–1072.